Bräkne-Hoby heating plant

Owner: Ronneby Miljöteknik Location: Bräkne-Hoby, Sweden Existing heat plant: 5 MW hot water boiler Fuel: Wood chips Heat generation: 15 GWh/year Temperature boiler circuit: 108 ˚C Return temperature district heating: 53˚C Againity’s delivery: ORC AT50 Max capacity: 49.9 kW Expected electricity generation: 300 MWh/year

Hörby heating plant

Owner: Solör Bioenergi Location: Hörby, Sweden Existing heat plant: 6 MW hot water boiler Fuel: Wood chips Heat generation: 24 GWh/year Temperature boiler circuit: 120 ˚C Return temperature district heating: 51˚C Againity’s delivery: ORC AT50 Max capacity: 49.9 kW Expected electricity generation: 400 MWh/year

Örkelljunga heating plant

Owner: Örkelljunga Fjärrvärmeverk Location: Örkelljunga, Sweden Existing heat plant: 7 + 3.5 MW hot water boiler Fuel: Wood chips Heat generation: 35 GWh/year Temperature boiler circuit: 130 ˚C Return temperature district heating: 45˚C Againity’s delivery: ORC AT250 Max capacity: 250 kW Expected electricity generation: 1000 MWh/year

Töreboda heating plant

Owner: VänerEnergi Location: Töreboda, Sweden Existing heat plant: 4 + 4 MW hot water boiler Fuel: Wood chips Heat generation: 28 GWh/year Temperature boiler circuit: 105 ˚C Return temperature district heating: 50˚C Againity’s delivery: ORC AT50 Max capacity: 49.9 kW Expected electricity generation: 265 MWh/year